Location :
At village Rani under Rani Dev. Block, Kamrup, AssamReference of Approval :
The scheme was administratively approved for 10,674 Lakhs vide No. NED/27/67/57 dt 26.02.66 and technical sanction has been made in two parts. First part T.S. accorded for Rs. 3.7047 Lakhs vide T.S. No. 21 of 1966-67 by Addl. CE ( E&D) and the T.S. for 2nd part was accorded for Rs. 7.181 Lakhs vide T.S. No. 237 of 1975 by the CE ( Irrigation)Date of Starting of works :
1966Date of completion of work :
1975Works :
Works relating to construction of Head Works, canal structures, construction of X-drainage syphones C.C. falls, dividing dams, culverts etc.Source of water :
Kopili River which is originated from Khasia and Jayantia hills of Meghalaya.Functioning of the scheme :
The scheme is under operation and supplying water to paddy field.Net Irrigated Area of the Scheme :
1331 HectNos. of Revenue Villages Benefited :
14 ( Fourteen) Nos.Nos. of Family Benefited :
500 ( Approx)
|
|
|
Location :
The Kalmoni Irrigation Scheme is situated at Bakarapara village under Palashbari Revinue Circle of Kamrup District of Assam.Reference of Approval :
The scheme was administratively approved for 10,674 Lakhs vide No. NED/27/67/57 dt 26.02.66 and technical sanction has been made in two parts. First part T.S. accorded for Rs. 3.7047 Lakhs vide T.S. No. 21 of 1966-67 by Addl. CE ( E&D) and the T.S. for 2nd part was accorded for Rs. 7.181 Lakhs vide T.S. No. 237 of 1975 by the CE ( Irrigation)|
|
|
Date of Starting of works :
1964-65No. of Cross Regulator:
1 No.No. of Head Regulator :
2 Nos.Design Discharge Right H/R- :
9.00 CubecDesign Discharge Left H/R- :
70 CubecCanal length :
14.425 Km ( Originally)Design Discharge Right H/R- :
9.00 CubecNet Irrigated Area of the Scheme :
950 Hector for Kharif and 72 Hector for Rabi crops.Nos. of Villages Benefited :
7 Nos. These are (i) Bakarapara (ii) Rajapanichanda (iii) Sajanpara
Location :
The scheme is situated at Mazirgaon village near Palashbari under Rani block in the district of Kamrup. It is about 40.00 Km distance from Guwahati
Name of Section :
Ubhati Flow Irrigation Scheme ( Section)1. Ubhati Flow I/S ( Ph-I):
In this scheme all the works under Ubhati I/S ( Ph.-1) have been completed. All the structure and Head Works, approach road and canal M ( from Ch. 0 M t5o 2940M) S.O's Quarter at Loharghat, S.A. Quarter at H/W site are constructed under Ubhati Flow I/S ( Ph-I)2. Ubhati Flow I/S ( Ph-II):
This scheme includes the provision of the canal M1,M2,M3,M4,M5,M6,L,L1,L2 and R, R1, and R2. All the canal structure of those Canals, 1 No. S.A. Quarter at Loharghat , 1 No. Khalashi Quarter at H/W site and twin type Khalashi Quarter at H/W are constructed and completed under this scheme except twin type Khalashi Quarter.Details of Canal :
Canal M1= 1290 M, M2= 1320 M, M3= 3550 M, M4= 650 M, M5= 1890M, M6= 2960 M ; L= 3900M, L1= 1740 M, L2= 2490 M -- All these canals are completed
|
|
Location :
Village Rajapara, Block : Boko, District: Kamrup, Assam.Reference of Approval :
The scheme was administratively approved for Rs. 14.778 Lakhs vide No. NED/262/64/23 dt 4.01.67 and technically sanctioned for Rs. 5.48 Lakhs vide No. 622/64/Pt II/7 Dt. 19.05.67 for Ph. I and Rs. 10.773 Lakhs for Phase II vide No. FCI/TB-1/138/74 Dt. 22.02.76Date of Starting of works :
In 1973Date of completion of work :
In 1976Works :
Works Earthen Canal, fall, culvert, dividing, dam, Hume pipe, siphon, lined canal, etc.Source of Water :
From river SinguaNet Irrigated Area of the Scheme :
2048 Hect. for Kharif and 72 Hector for Rabi crops.Annual Irrigated Area of the Scheme:
3,200 HectorNos. of Villages Benefited :
16 Nos.Nos. of Family Benefited :
311 Nos.Potential Utilised Last Rabi Season :
519 Hec.
|
|
Location :
The Head work lies in the village Bhatapara under Boko Revenue Circle, Boko.Reference of Approval :
The scheme was administratively approved for Rs. 14.778 Lakhs vide No. NED/262/64/23 dt 4.01.67 and technically sanctioned for Rs. 5.48 Lakhs vide No. 622/64/Pt II/7 Dt. 19.05.67 for Ph. I and Rs. 10.773 Lakhs for Phase II vide No. FCI/TB-1/138/74 Dt. 22.02.76Date of Starting of works :
In 1973Date of completion of work :
In 1976Works :
Works Earthen Canal, fall, culvert, dividing, dam, Hume pipe, siphon, lined canal, etc.Source of Water :
From river SinguaNet Irrigated Area of the Scheme :
2048 Hect. for Kharif and 72 Hector for Rabi crops.Annual Irrigated Area of the Scheme:
3,200 HectorNos. of Villages Benefited :
16 Nos.Nos. of Family Benefited :
311 Nos.Potential Utilised Last Rabi Season :
519 Hec.
|
|
|
Introduction:
The scheme was started by Agricultural Department in the year 1969 and completed in the year 1970-71.Later in the year the 1980 the scheme was handed over in the Irrigation Department.Location :
Village Milaghat,Bamunigaon,Chaygaon BlockReference of Approval :
The A.A. of the Improvement of Dimali Scheme was accorded vide no. IGN(P)365/91/2 dt 31-03-91 for Rs.9.97 Lakhs and the revised A.A was accorded vide no. DDMI/TB-8/74/2001/7 dt 30-03-02 for Rs.48.62 Lakhs.Date of Starting of works :
1990-91Date of completion of work :
2002-03Works :
Works relating to construction of protection works, brick line canal, Boulder pitching works, Afflux bund etcSource of Water :
Dimali riverFunctioning of the Scheme :
The scheme is functioning since 1980 and irrigated an area of 250 H.N.I.A.:
400 HA.I.A.:
520 HNos. of Villages Benefited :
5 (Milaghat, Khatira, Nijbagini and Lakadubi)Potential Utilised Last Rabi Season :
199 Hector
|
|
|
Location :
Rampur Development Block, RampurReference of Approval :
The A.A was accorded vide no, IGN ( p ) 175/88/12 dt 20-03-88 for Rs. 7.89 Lakhs and revalidated for Rs. 5.0 Lakhs vide no. IGN(W)89/99/145 dt 30-06-2000 under NLCP-II.Date of Starting of works :
1989-90Date of completion of work :
2003-04Works :
Works relating to construction of protection works,brick line canal,boulder pitching works,Afflux bund etc.Source of Water :
Water is pumped out from the Deep Tube Well by 5 H.P. pumpFunctioning of the scheme :
The scheme is functioning since 2005N.A.I.:
30 Hector /font>Nos. of Villages Benefited :
1 No.Potential Utilised in Last Rabi Season :
30 Hector